BS25-C206B Double Plus Chain Plastic Rollers
BS25-C206B 2.5x double plus pallet conveyor chain with plastic rollers, 19.05 mm pitch and an exact verified dimensional table. Suitable…
BS25-C210A 2.5x double plus pallet conveyor chain with plastic rollers, 31.75 mm pitch and an exact verified dimensional table. Suitable for engineering review in workpiece-carrier and assembly conveyor systems.
BS25-C210A Double Plus Chain Plastic Rollers should be checked with sprocket pitch, rail contact, carrier underside, strand spacing, drive layout and operating environment. For replacement work, send the installed model, measured pitch, sprocket details and clear side/end photographs. For new equipment, send carrier mass, line speed, carrier count, start/stop sequence and station interfaces.
BS25-C210A is a 2.5x double plus conveyor chain in the plastic-roller series, with a specified pitch of 31.75 mm. This chain family is designed for conveyor layouts in which the chain itself runs at a lower travel speed while the supported workpiece carrier can move faster through the action of the roller arrangement. The series technical data identifies the double plus family for flexible assembly-line conveying, including light-industry production such as electrical-appliance assembly. On pallet-based automation lines, that geometry can be useful when a designer needs controlled workpiece-carrier transfer without simply increasing chain speed. The exact suitability of a chain for accumulation, stopping at stations, or transfer between modules still depends on the complete conveyor design, including rail geometry, pallet underside, stops, guide elements, lubrication and the matched sprockets.
This model is most useful when it is treated as one element of the entire conveyor mechanism, not as an isolated replacement part. For BS25-C210A, the 31.75 mm pitch must match the intended sprocket pitch and the rest of the chain path. The technical data also gives a large-roller diameter d8 of 30.6 mm and a pin diameter d2 of 5.08 mm. These are not decorative values: they affect the relationship between the chain, guide rails, carrier surface and sprocket engagement. The listed chain mass is 1.36 kg/m. That mass is useful when estimating the moving system, but it is not an allowable payload figure. In the selected family, BS25-C210A sits between BS30-C208A and BS30-C210A by pitch. That makes it a useful mid-range reference, but each adjacent model has its own roller, pin and plate geometry, so dimensions should be checked row by row. A buyer evaluating an existing conveyor should therefore send the old chain code, measured pitch, clear photographs of the roller arrangement and the drive sprocket, and ideally a drawing of the pallet contact path.

Use this drawing together with the model table. Pitch, roller, pin and plate symbols are meaningful only when matched to the corresponding view.
All numerical values on this page are copied from the model-specific data row in the technical data available for this model. Fields that the technical data does not state are intentionally not filled with estimated values.
| Parameter | Catalogue value |
|---|---|
| Pitch P | 31.75 mm |
| Small roller d1 max | 19.05 mm |
| Large roller d8 max | 30.6 mm |
| b1 max | 7.1 mm |
| b2 min | 13 mm |
| Pin diameter d2 max | 5.08 mm |
| Pin length L max | 39.5 mm |
| Pin length Lc max | 41.2 mm |
| Plate depth h2 max | 15 mm |
| Outer plate T max | 2.03 mm |
| Inner plate t max | 2.03 mm |
| Mass q | 1.36 kg/m |
Dimensions should be checked against the drawing before a replacement order is released. Symbols such as P, d1, d2, d4, d8, b1, b2, L, Lc, h2, T and t refer to the corresponding catalogue drawing for this chain family.
A pallet conveyor chain has to work with the complete transport path. The chain engages the sprockets, follows the guide or wear rail, supports or drives the carrier through a defined roller interface, and then returns through the lower strand. The pallet or workpiece carrier may also meet stops, locators, lifts, transfers, sensors and process stations. For that reason, a correct chain model can still perform poorly if the rails are misaligned, if the sprocket tooth form does not match the chain, or if the carrier contacts the wrong roller surface.
Current conveyor-system terminology commonly describes pallet transport in terms of workpiece carriers, buffering, positioning, separation, locating stations, stops, merges and transfers. Those functions are system-level features. BS25-C210A should therefore be selected from its specified geometry first, then checked against the required conveyor function. EVER POWER does not treat a catalogue tensile value or a family description as a substitute for a system calculation.
For a new conveyor, begin with the workpiece carrier and the required production sequence, then work outward to the chain path. For a replacement, begin with the installed chain and measure what is actually on the machine. In both cases, the objective is to remove ambiguity before production or shipment.
When two models look similar in a photograph, use the dimensional table and drawing to separate them. A different pin length, roller diameter or plate depth can be enough to cause interference with a guide, misalignment with a sprocket or incorrect pallet contact. If measurements from the installed chain do not match the table, send those differences with the inquiry rather than forcing the nearest model number.
Chain and sprocket selection should be reviewed together. The sprocket pitch must correspond to the chain pitch, while tooth form, tooth count, bore, hub arrangement and shaft connection belong to the machine design. Reusing an old sprocket without checking its wear condition can shorten the service life of a new chain. Conversely, ordering a new sprocket from only a photograph can create a mismatch at the bore or hub even if the tooth pitch is correct.
The rail side of the system deserves the same attention. Check material, straightness, transitions, joints, return guides and the vertical position of every surface that contacts a roller. Pallet stops and locating devices should stop or locate the carrier without forcing the chain sideways. In multi-strand conveyors, keep the strands aligned and tensioned so one side does not pull the pallet ahead of the other. For longer systems, document the take-up travel and the method used to maintain chain length and tracking.
EVER POWER can quote matching sprockets and chain as a package when the sprocket requirements are provided. The companion sprocket is mentioned here because it is a functional partner to the chain; no bore, tooth count or hub dimensions are assumed from the chain model alone.
A short low-speed commissioning run is useful for verifying rail alignment, sprocket engagement and the clearance around stops, sensors and pallet location hardware. Verify that connecting links, retaining parts and any chain-specific attachments are fully seated before the machine is placed into automatic operation. Keep the two sides of a twin-strand conveyor synchronized during installation so the pallet does not enter stations at an angle.
Pay particular attention to the roller/rail interface. A speed-conveyor chain relies on the installed geometry around the rollers, so contamination, damaged rail surfaces or incorrect pallet contact can change the behavior of the carrier even when the chain itself is dimensionally correct. Establish an inspection interval from the real duty cycle rather than using one universal schedule. A line that indexes continuously, operates in abrasive contamination or experiences frequent pallet stops may need more frequent checks than a lightly used transfer conveyor. Record elongation, roller condition, unusual noise, hot spots, sprocket wear and any recurring tracking correction so maintenance decisions are based on trend rather than guesswork.
Lubrication practice should follow the chain construction, environment and process restrictions. Avoid applying a lubricant simply because another chain on the same machine uses it. If the conveyor operates near sensitive products, cleaning agents, elevated temperature or a process that restricts oil, state that condition during the RFQ so an appropriate chain and maintenance approach can be discussed.
For an RFQ on BS25-C210A, send the chain model if known, required quantity or length, destination country, machine application, conveyor speed, pallet or carrier details and any available drawing. Tell us whether the original design uses plastic or steel rollers and whether the required conveying ratio is 2.5x or 3.0x. If the request is a replacement for an installed chain, photographs of the complete chain, a close-up of one pitch, the sprocket and the rail interface are especially useful. EVER POWER can review the dimensional match and quote chain together with matching sprocket requirements when the sprocket data are available. Where the technical data do not define a property – for example a special material grade, attachment load, permissible working load or a particular coating – that property will be treated as an RFQ confirmation item rather than being assumed from the model family.
For production planning, also state whether you need endless matched lengths, loose chain lengths, connecting links, spare sections or sprockets. If the conveyor uses paired chains, tell us whether matched strand length is required. If a drawing contains tolerances or special interfaces not shown in the technical specification table, attach it to the inquiry. That information is more useful than a broad request for a “pallet conveyor chain” because it lets the quotation stay tied to the machine that will actually use the component.
The technical specification table lists a pitch P of 31.75 mm for BS25-C210A. Check the rest of the dimensions as well; pitch alone is not enough to confirm a replacement.
Double-plus/free-flow chain families are commonly applied in pallet and workpiece-carrier systems where carriers can be stopped or buffered, but accumulation behavior depends on the complete rail, stop, pallet and drive design. Confirm the actual conveyor arrangement before ordering.
Matching sprockets can be included in the RFQ. Provide tooth count, bore, hub or keyway requirements, and any existing sprocket drawing so the chain and sprocket can be reviewed together.
Send the old chain model, measured pitch, clear photos of the rollers and plates, sprocket details, conveyor speed, pallet or carrier weight, number of strands and the operating environment.
BS25-C210A is listed in the 2.5x double plus series. The ratio describes the speed relationship of the double-plus conveying arrangement, not a universal finished-conveyor speed.
This product page is for the plastic-roller version. Do not substitute the dimensions or image from the other roller material unless the conveyor design has been reviewed.
Use the model and table on this page as the starting point, then send your conveyor drawing, required quantity or length, destination country and any replacement-chain measurements to [email protected]. For retrofit work, include the sprocket and rail interface so the review covers the complete chain path rather than the chain alone.
Fiyat Teklifi İsteyin
The working interfaces are the pins, bushings, rollers, side plates and family-specific support features. The rail should support the intended roller surface without forcing side plates to carry track load. Sprockets must belong to the same pitch system and the carrier should contact only the surfaces intended to support it. Misalignment can appear as noise, edge wear, stiff articulation or uneven load sharing between strands.

This family is evaluated for palletized assembly, inspection, transfer and buffering where repeatable carrier motion matters. Coordinate stops, lifts, locators, sensors and transfers so process loads are reacted through fixtures rather than becoming unintended chain side loads. Accumulation or free-flow behavior is a system-level result.

Order release should check pitch consistency, roller and pin geometry, plate alignment, articulation, surface condition and the model dimensions that interface with the conveyor. If material certificates, inspection reports or order-specific compliance documents are required, list them in the enquiry before order acceptance.

| MOQ | Set according to product type, production batch and order value; high-value or large items may be evaluated by order value. |
|---|---|
| Samples | Suitable new-customer samples of 1-5 pieces may be discussed at sample pricing. |
| Mixed models | Multiple models can be combined toward approximately USD 1,500. |
| Very small needs | Qualified engineering/sample needs for 1-2 pieces may be evaluated at higher unit cost; routine consumer-style 1-2-piece retail orders are not accepted. |
| Lead-time planning | Standard parts 10-25 working days; customized components 20-45; project equipment 45-120, subject to final production review. |
| Trade terms | EXW, FOB, CIF and DAP are commonly supported; FCA, CFR, CPT, CIP and DDP can be discussed per shipment. |
Compare this model with its product family to check neighboring sizes and configurations. Then use the pallet conveyor engineering workflow to confirm the carrier, rail, sprocket, duty and replacement interfaces before order release.
Reference BS25-C210A and attach the conveyor drawing or marked photograph showing chain path, sprocket, rail contact and carrier interface. Include quantity, replacement/new-design status, environment, documentation requirements and delivery window. If the code is uncertain, add measured pitch over multiple joints and a side-view photograph.